Register for Contractor Pre-Qualification

Project Brief:

At Lagos Free Zone Company, we are embarking on various construction projects within the Lagos Free Zone located at Itoke Village, Ibeju-Lekki, Lagos State (the “Zone”). The proposed developments encompass a wide range of activities including construction of Residential, Commercial and Industrial buildings, supply and erection of Pre-Engineered Steel Buildings (PEB), supply and installation of Mechanical, Electrical & Plumbing services, HVAC works, Lift supply and installation, Land clearing and Reclamation works, soil investigation works, roads and drain construction and all other general contracts required for the development of the Zone. We invite reputable and experienced contractors, design consultants and suppliers specializing in these areas to participate in our pre-qualification exercise.

Register for Contractor Pre-Qualification

Eligibility for Pre-Qualification:
  • • Should have a minimum of 10 years of experience and presence in the Country.
  • • Must have a proven track record of consistently working with proper and stringent Safety and Quality standards without any compromises.
  • • Must provide tangible evidence of experience with similar jobs, showcasing their capabilities and expertise in the field.
  • • Must possess the necessary technical expertise and qualifications relevant to the scope of work,
    including certifications and accreditations from recognized industry bodies.

 

Click the link below to download:
Invitation for Pre-Qualification

Fill out Prequalification forms

Register for Pre – Qualification Exercise

1. Contractors, Consultants & Architectural Firms

Kindly provide the duly filled-in Pre-Qualification form, FS evaluation form and sustainability Questionnaire.

Click the below links to download.

 

2. Recruiters

Kindly provide the duly filled-in Pre-Qualification form and sustainability Questionnaire. Recruiters are not required to submit the FS evaluation form.

Click the below links to download.

Submit Application and documentation:

Submit your application and documentation.

The documents stated in the Pre-Qualification form shall be submitted along with your application forms.

Submit the filled-in forms along with all the attachments to the below mail ID.

LFZTenders@tolaram.com

Completion of Registration

Once the documents are reviewed by LFZC and found satisfactory, the pre-qualified contractors will be contacted for further processes when the need arises. Contractors who do not meet the qualification criteria will be informed of their disqualification, along with the reasons for such a decision.

Disclaimer
The information contained on the website, in the Invitation for Prequalification (IFPQ), or subsequently provided to an applicant(s) is set out to provide interested parties with information that may be useful to them in the preparation of their application. The IFPQ is not an agreement or an offer and should not be construed as a commitment or obligation on the part of LFZC to award the contract. LFZ is not bound to pre-qualify any bidder and it reserves the right, in its sole discretion, to accept or reject any application without assigning any reason whatsoever.
LFZC makes no representation or warranty and shall have no liability to any person, including any applicant, under any law, statute, rules or regulations or tort, or otherwise for any loss, damages, cost or expense which may arise from or be incurred or suffered on account of anything contained in the IFPQ or otherwise, including the accuracy, adequacy, correctness, completeness or reliability of the IFPQ and any assessment, assumption, statement or information contained therein or deemed to form part of the IFPQ or arising in any way with pre-qualification of applicants for participation in the future bidding process.
LFZC may, in its absolute discretion but without being under any obligation to do so, update, amend, or supplement the information, assessment or assumptions contained on the website or in the IFPQ.
The applicant shall bear all its costs associated with or relating to the preparation and submission of its application. LFZC shall not be liable in any manner whatsoever for the same, regardless of the conduct or outcome of the application or the bidding process.
WhatsApp